WEKO3
インデックスリンク
アイテム
まとめとしての「わが国におけるニューマチックケーソン工法発展の歴史的背景に関する考察」(A.特集論文,開学20周年記念特集号)
https://fukuyama-u.repo.nii.ac.jp/records/7947
https://fukuyama-u.repo.nii.ac.jp/records/7947da9728a2-bf83-4f78-82fa-0b507a66d0a9
名前 / ファイル | ライセンス | アクション |
---|---|---|
![]() |
|
Item type | 紀要論文(ELS) / Departmental Bulletin Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 1995-11-01 | |||||
タイトル | ||||||
タイトル | まとめとしての「わが国におけるニューマチックケーソン工法発展の歴史的背景に関する考察」(A.特集論文,開学20周年記念特集号) | |||||
タイトル | ||||||
タイトル | "Historical Study on the Development of Pneumatic Caissm Methold in Japan" as Concluding(A.Special Article,Special Edition for the 20th Anniversary of the University) | |||||
言語 | en | |||||
言語 | ||||||
言語 | jpn | |||||
キーワード | ||||||
言語 | en | |||||
主題Scheme | Other | |||||
主題 | Foundation | |||||
キーワード | ||||||
言語 | en | |||||
主題Scheme | Other | |||||
主題 | Construction method | |||||
キーワード | ||||||
言語 | en | |||||
主題Scheme | Other | |||||
主題 | Pneumatic caisson method | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||
資源タイプ | departmental bulletin paper | |||||
ページ属性 | ||||||
内容記述タイプ | Other | |||||
内容記述 | P(論文) | |||||
著者名(日) |
平川, 修治
× 平川, 修治 |
|||||
著者名よみ | ||||||
識別子Scheme | WEKO | |||||
識別子 | 42715 | |||||
姓名 | ヒラカワ | |||||
著者名(英) | ||||||
識別子Scheme | WEKO | |||||
識別子 | 42716 | |||||
姓名 | Hirakawa, S. | |||||
言語 | en | |||||
著者所属(日) | ||||||
値 | 福山大学工学部土木工学科 | |||||
抄録(英) | ||||||
内容記述タイプ | Other | |||||
内容記述 | In reviews of a pneumatic method in our country, there are many misunder standings associated with periods and terms in books and reports. It is especially remarkable that these misunderstandings happened at the period which the pneumatic method was introduced to our country at the early period. About one hundred years was past since the pneumatic method with airlock was introduced to our country in 1899. It is unusual that a properconstruction method has been used for a long time. These are caused by somereasons which are modification of the construction machines imported from theover sea at the early period, active application to field works, settlement of the design methods and introduction of high project management. The author clasifing thies subject under three problems the desiguwethod of pneuwatic caisson, the excavatim machine and the project management and has investigated the processes of each problems. This report is written subject to the pneumatic caisson method of up to date as concluding. | |||||
雑誌書誌ID | ||||||
収録物識別子タイプ | NCID | |||||
収録物識別子 | AN00217655 | |||||
書誌情報 |
福山大学工学部紀要 巻 19, 号 1, p. 27-35, 発行日 1995-11 |